Client:
Orange County Highway Construction Division
Value:
$8,845,000
Year:
2009
Scope:
This project involves construction of a 1.7 mile four-lane urban divided highway with 8,883 LF of storm water drainage system including drainage structures and three retention ponds. Also included is 9,275 LF of force main construction and removal, abandonment and grouting of existing force mains.
|